Skip to main content
Costimator Accuracy isn't Optional

Estimation and Justification software for CPWD (DSR) and Railways (USSOR)

You add the items and quantities. Costimator does the rest: every rate analysis, every report and every Excel file, automatically built for you.

  • Free for 14 days
  • No Installation
  • Works in any browser

Rate books

Built on Schedule of Rates (SoR) you already use.

Central Public Works Department

CPWD

Delhi Schedule of Rates (DSR) with its Delhi Analysis of Rates (DAR), in both GST methodologies.

Old Methodology 21.27% GST
As in CPWD's published DSR-2023

DSR + DAR

  • Civil
  • 2023
OM
08-Aug-24
New Methodology · OM-compliant 18% GST
Already in Costimator

DSR + DAR

  • Civil
  • 2023

Ahead of CPWD's own schedule CPWD's OM dated 08-Aug-2024 corrected how GST enters rate analysis. The published DSR-2023 still carries the old calculation. Costimator already runs the corrected one, and keeps the old one for projects that need it.

Indian Railways

Railways

Unified Standard Schedule of Rates (USSOR) with its Analysis of Rates (AoR).

Old GST & Methodology 14.05% GST

Unified Standard Schedule of Rates

USSOR + AoR

  • Civil
  • 2021

Working from a different schedule of rates? Tell us which one at support@costimator.in , and we'll look at bringing it into Costimator.

Why choose Costimator?

Every step of an estimate and its justification, done the manual way and done in Costimator, side by side.

Scroll ↓

Estimation

From Finding the Right Item to a Finished Estimate.

Six steps, from the rate book to the resources the job will need.

Skip the comparison

Up to date Schedules · Problem · Manual method

Keeping track of every correction slip by hand is hard.

  • Scattered PDFs
  • Correction slips
  • Outdated rates

A DSR 2023 table where Correction Slip 01 changes item 6.44 from 59.45 to 60.85 and resource 0006 from 9,750.00 to 250.00.

Source: Correction Slip No. 01, 10/11/2023, to DSR 2023.

Up to date Schedules · Solution · Costimator method

We track the correction slips, so you don’t have to.

  • Corrections included
  • Maintained by us
  • Always updated

Costimator search showing item 6.44 at the corrected 60.85 and resource 0006 at the corrected 250.00.

Finding Correct Items · Problem · Manual method

Finding the right item in a PDF is a nightmare.

  • Locked PDFs
  • Separate PDFs
  • Page-by-page search

A PDF search for “piling” finds four results and misses the pile items; a search for “pile” returns 166 matches over 19 pages, most of them unrelated.

Finding Correct Items · Solution · Costimator method

Search once. See the item and its analysis together.

  • All matches
  • Subhead filter
  • One-click analysis

A Costimator search for “piling” lists 23 matching items by subhead, then opens the full rate analysis of 20.1.1, ending at ₹2,692.40 per metre.

Adding Items to Estimate · Problem · Manual method

Building an estimate means typing, copying & pasting.

  • Typos
  • Wrong rates
  • Unit errors
  • Incorrect estimates

Pile items typed into Excel with a dropped digit, a wrong unit and swapped rate digits, so the total is 9,82,969.00 instead of 9,50,569.00.

Adding Items to Estimate · Solution · Costimator method

Find & select the items. Nothing to type.

  • No typing
  • No errors
  • One-click add

In Costimator, items are picked from Earthwork, Concrete Work and Pile Work using the subhead dropdown and collect in a tray, with nothing typed.

Adding Detailed Measurements · Problem · Manual method

Measurements in Excel mean linking sheets and fixing formulas.

  • Linked sheets
  • Broken formulas
  • Error-prone
  • Difficult to maintain

In Excel, a lift pit row added below the SUM range is left out, so the linked quantity for 2.8.1 stays at 60.48 instead of 65.28.

Adding Detailed Measurements · Solution · Costimator method

Enter the measurements. We take care of the rest.

  • No second sheet
  • No formulas
  • No errors
  • Nothing to maintain

In Costimator, quantities are typed directly, and item 2.8.1 is measured in its own measurement window, deduction included, giving 63.66 cum.

Estimate Insights & Analytics · Problem · Manual method

300 items, and no idea where the money is going.

  • No subhead breakup
  • No top items
  • No graphical breakdown

A 300-row Excel estimate scrolls to a single total of 4,87,00,035.63; the only summary Excel offers is a count and a sum.

Estimate Insights & Analytics · Solution · Costimator method

See where the money goes with intelligent graphical insights.

  • Breakup by subhead
  • Top items
  • Graphical breakdown

Costimator breaks the same ₹4.87 crore estimate down by subhead in a donut chart, led by Reinforced Cement Concrete at 26.9%, and lists the top items.

Resource Planning · Problem · Manual method

Working out resources in Excel means adding up every analysis by hand.

  • No resource totals
  • No takeoff
  • Hand calculations

In Excel, cement is worked out item by item from each rate analysis to 16.21 tonnes, leaving 28 other resource columns empty.

Resource Planning · Solution · Costimator method

Know the material, manpower & machinery before work starts.

  • Resource takeoff
  • Material, manpower & machinery
  • Automatic calculations

Costimator’s resource takeoff totals material, manpower and machinery, and shows that cement’s 16.21 tonnes come from five items.

Justification

From Market Rates to a Justified Estimate.

Five steps, from market rates to a justification you can defend line by line.

Approximations made in good faith can still lead to audit observations and vigilance inquiries.

Skip the comparison

Adjusting CPOH, GST & Cess · Problem · Manual method

One change to CPOH, GST or Cess means re‑analysing every item by hand.

  • Every AoR edited by hand
  • Typos
  • Calculation errors

An Excel workbook with one rate analysis per item, where CPOH is retyped from 15% to 12.5% on each sheet; sheet 4.1.8 gets 1.25% by mistake, and on sheet 20.1.2 the rate is a typed number with no formula, so it never recalculates.

Adjusting CPOH, GST & Cess · Solution · Costimator method

Any change to CPOH, GST or Cess automatically re‑analyses every item.

  • Changed at project level
  • Nothing retyped
  • No hand calculation

In Costimator, CPOH is changed once to 12.5% under Adjust Margins, the project margins fall from 38.43% to 35.42%, and the Analysis of Rates shows every item rebuilt with 12.5% CPOH.

Updating Market Rates · Problem · Manual method

Change one rate, and every AoR that uses it must be edited.

  • Items inside items
  • Typed into each AoR
  • Silent mistakes

Cement is retyped at 5,600 in item 4.1.8, but in item 20.1.1 the cement sits one level down, inside sub-item 5.33.1.1, so a search on the sheet finds nothing and the item's rate stays wrong.

Updating Market Rates · Solution · Costimator method

One list of resources. Enter market rates. We update every AoR.

  • Each rate typed once
  • Sub-items included
  • Nothing missed silently

Costimator's market rates list shows cement used by items 4.1.8 and 5.33.1.1; cement, coarse sand and Beldar are each entered once, and every analysis uses them.

Reusing Market Rates · Problem · Manual method

Market rates you collected get lost in old Excel files.

  • Rates hunted in old files
  • Retyped each time
  • Collected again next time

Old rate files are opened one by one, two of them disagree on cement (5,450 against 5,600), and each rate is then retyped into the new workbook by hand.

Reusing Market Rates · Solution · Costimator method

Save your market rates once. Reuse them every time.

  • One shared library
  • Applied with a preview
  • Matched to the right resource

A saved rate library, "Pile works — Q3 2026", is previewed and applied, and 18 market rates fill the matching rows, each marked as applied from the library.

Justification Statements · Problem · Manual method

Comparatives are made by hand and are hard to check.

  • Totals by hand
  • Error-prone
  • Slow to redo

A justification statement typed into Excel, where the Earthwork total misses item 2.8.1, so the total reads 10,99,313.38 instead of 11,16,100.52; a cement rate change then leaves every market figure out of date.

Justification Statements · Solution · Costimator method

Every statement, comparative and breakup, prepared for you.

  • Redone on every change
  • Excel downloads
  • Pre-formatted

Costimator's Justification Statement totals ₹11,16,100.52, 3.28% above ECPT; the rate variance reports and the breakup by subheads open from the reports list, and the statement downloads as an Excel file.

Revised Analysis of Every Item · Problem · Manual method

Every analysis, and every sub‑analysis inside it, redone by hand.

  • Level by level
  • Rates carried up
  • Error-prone

Three linked analyses in Excel, worked from the bottom level up; the sub-item's rate of 16,071.30 is typed into the main item as 16,017.30, so its rate comes out at 4,705.50 instead of 4,705.95.

Revised Analysis of Every Item · Solution · Costimator method

Every analysis, at every level, rebuilt at market rates automatically.

  • Rates carried up for you
  • Nothing calculated by hand
  • No rate retyped

Costimator's Analysis of Rates at market rates shows all three levels: 4.1.2 at ₹8,402.65 is carried into 5.19, and 5.19 at ₹16,071.30 into 20.5.2, which comes to ₹4,705.95 per metre.

Reports

Every report you submit, built for you.

Check it on screen, then download it as a formatted Excel file.

  • Bill of Quantities

    Every item with its quantity, rate and amount.

    Estimation
  • Detailed Measurements

    The Nos × L × B × H behind every quantity.

    Estimation
  • Breakup by Subheads

    Cost of each subhead and its share of the total, with a chart.

    Estimation Justification
  • Breakup by Top Items

    The few items that carry most of the cost.

    Estimation Justification
  • Resource Takeoff

    Material, manpower and machinery totals for the whole work.

    Estimation Justification
  • Justification Statement

    Market amount against the estimate, line by line.

    Justification
  • Analysis of Rates

    The full rate build-up, down to every sub-item.

    Justification Non-SOR
  • Resource Rate Variance

    Each resource, schedule against market, marked ↑ or ↓.

    Justification Non-SOR
  • DSR Rate Variance

    Each schedule item, its rate against the market rate.

    Justification

Download every report as Excel.

  • ✓ Pre-formatted
  • ✓ Indian number format
  • ✓ Totals & subtotals
  • ✓ Ready to submit

Speed

Start ahead. Change anything later.

Bring in your BOQ, find any item, and change anything later.

Excel, CSV or PDF. Each line is matched to the schedule for you to review.

Non-Scheduled Items

Not in the schedule? Make it.

Add your own resources, build the item with a full rate analysis, and pick it like any schedule item.

Custom resource

Precast kerb stone, 300 × 150 mm

Unit
each
Rate
₹185.00
Non-SOR item

Kerb laying with precast stone · per metre

Precast kerb stone 3.33 × 185.00 616.05
Beldar 0.10 × 736.00 73.60
Mason 0.05 × 1,050.00 52.50
Water charges 1% · CPOH 15% 119.86
Say (per metre) 862.00
Any estimate

Select Items

20.1.1 Bored piles, 400 mm
4.1.8 PCC 1:4:8
Non-SOR items
Kerb laying, precast stone

Sharing

Share your work. Use theirs.

Publish what you have built, or add what someone else has published. Every copy is yours to edit.

What you share Marketplace Every Costimator user Specific people Up to 20, by email Team Library Your organisation
Project templates ✓ ✓ ✓
Non-SOR items ✓ ✓ ✓
Rate libraries ✓ ✓ ✓

✓ Whoever adds it gets their own copy. Your original stays yours.

Works where you work

Open it and work. Anywhere.

  • Any browser

    Chrome, Safari, Firefox or Edge.

  • Any device

    Desktop, tablet or phone.

  • Nothing to install

    Open the site, sign in, work.

  • No dongles

    No USB keys or licence files.

Who it’s for

Built for every side of the tender.

Department side

Prepares the estimate and justifies the rates.

  • Government Engineers
  • PSU Engineers
  • Railway Engineers
  • Draftsmen

Consultant side

Prepares estimates for clients and checks the rates.

  • Private Engineers
  • Consultants
  • Architects
  • PMC

Contractor side

Prices the bid against the department’s schedule.

  • Contractors
  • Bidders
  • Estimators
  • Quantity Surveyors
Kushal Singh, founder of Costimator

The founder

Built by someone who did the estimating.

I spent years preparing estimates as an Executive Engineer at CPWD, and built a tool for my own work that colleagues started using. In 2025 I left the Indian Engineering Services to build Costimator full-time.

Kushal Singh

Founder, Costimator

Ex-IES Officer (2014 batch) · Ex-CPWD, MoHUA

Read the full story

Questions

Frequently Asked Questions

What does the free trial include?

14 days of Costimator on one publication you choose when you start, with estimation, justification, Non-SOR items and every report. The trial allows up to 3 projects of 20 items each, 3 Non-SOR items and one rate library. No card is needed, so nothing is charged when the trial ends. Compare the plans →

Which rate books are available?

CPWD DSR-2023 (Civil) with its DAR, under both the new GST methodology in CPWD’s OM dated 08-08-2024 and the earlier one; and Railways USSOR-2021 (Civil) with its analysis of rates. Working from a different schedule? Tell us which one .

Will the rates match the published schedule?

Every rate is built from the schedule’s own analysis data (its resources, sub-items and margins), with the full working shown, so you can check any rate against the book. The calculations were checked by hand to the paisa.

How are rates kept up to date?

When a new edition, correction slip or methodology OM is published for a rate book we carry, we add it. You don’t track the changes yourself.

Can I bring my existing estimate?

Yes. Upload your BOQ as Excel (.xlsx), CSV or a digital PDF, map its code, description and quantity columns, review the matches, and Costimator creates the project. It works on the trial too, within its limits. Scanned PDFs aren’t supported.

Can I add items that aren’t in the schedule?

Yes. Build a Non-SOR item with its own analysis from the publication’s resources, other SoR items or custom resources, and add it to any estimate.

Can I share my work?

On paid plans, share project templates, Non-SOR items and rate libraries: on the Marketplace, with specific people (up to 20, by email), or to your organisation’s Team Library on Teams. Each person gets their own copy. See how sharing works .

Do I need to install anything?

No. Open the site, sign in and work in any browser on Windows, Mac or Linux. No USB keys or licence files. Every report downloads as Excel.

Can my office buy on a government purchase order?

Yes. Central and state departments, PSUs and autonomous bodies can buy on a PO. Send the PO with the plan details and we activate the subscription. For a department-wide licence, contact us first.

Have other questions? Get in touch

Your next estimate, with the working shown.

14 days free on the rate book you work with. No card needed.

  • Free for 14 days
  • No Installation
  • Works in any browser

You can change this any time from “Cookie settings” at the bottom of every page.

We don’t use advertising cookies. Cookie Policy